VA-244-10-RP-0065 | Monument Construction LLC
Posted by adminMar 9
The Design-Build Team A/E (DB A/E) shall design the project work to meet VA, NFPA, and BOCA requirements. Work shall include but is not limited to: Reviewing existing site conditions. Perform site prep (including demolition of all utilities ) trenches, … A soiled holding for linens, with a negative pressure. A clean holding for linens, with a positive pressure. A cart wash, with pressure washer. A Mechanical room for battery operated equipment. An overhead paging system. …